Today was a lot of organising and fiddling trying to get an engineer to design a steel beam to replace the wall in the kitchen. There is such a range in price and what they are willing to let you do to reduce the cost. Some insist on coming to site with a hefty $600 call out fee. Some are happy to work from drawings and pictures. At the end of the day it is a necessary cost to ensure you are going to support the wall appropriately. I learnt a lot about roofs today, under purlins, hanging beam etc long story short we finally have the info we need to order the beam to take out the wall. Kitchen space here we come.
Reno tip- don't be afraid to shop around for engineers. Some are very busy and less willing to negotiate their fees. Try and find one that specialises in smaller jobs- they sometimes have a smaller price tag
Thursday, September 20, 2012
Monday, September 17, 2012
Day 14- two down two to go
Today is two days of renovating down. It feels like more than that. It's a bit like when you are watching something disastrous happen and you see it in slow motion! We have two weeks before we need to move in. That means all the walls, floors and bathrooms need to be done. I can survive without the kitchen I have decided. Especially with the Matador BBQ Steve bought. The ceiling in the bathroom needed to be redone so that was today's task. Most of these photos have been "taken by toddler". She was our official photographer today.
To say was not my favourite job is an understatement. Plaster sheets are heavy and they were just high enough over my head that my arms were at 3/4 stretch. A really awkward position to hold something heavy. Not to mention the gymnastic back bend required to lift it into position. Note to self- too much time spent away from yoga.
The sheets did go up finally and the plaster set so tomorrow will be a pit of paint a bit of cornice and the room is ready to tile! Yay.
Today's Reno tip- putting up plaster sheeting on the ceiling is hard! If you don't know what you are doing ripe in as many people as possible to hold it up. You can build a wood T like apparatus called a third man to help but as far as I'm concerned about 5 men would have been helpful.
To say was not my favourite job is an understatement. Plaster sheets are heavy and they were just high enough over my head that my arms were at 3/4 stretch. A really awkward position to hold something heavy. Not to mention the gymnastic back bend required to lift it into position. Note to self- too much time spent away from yoga.
The sheets did go up finally and the plaster set so tomorrow will be a pit of paint a bit of cornice and the room is ready to tile! Yay.
Today's Reno tip- putting up plaster sheeting on the ceiling is hard! If you don't know what you are doing ripe in as many people as possible to hold it up. You can build a wood T like apparatus called a third man to help but as far as I'm concerned about 5 men would have been helpful.
Day 13- nan is back in the building.
Today Nan came back after a nice month long holiday in the continent! To say I'm relieved, excited and down right jumping for joy that she is back is only slightly understating it! Trying to renovate with two little ones is like trying to renovate with two hands tied behind your back but I just found another set of hands. We are going to be full steam ahead now.(I hope)
Today there were guided tours for the family. Safety gear a must! The kids searched the backyard for nuts while the adults got the low down on the plans.
That left little time for much else except repairing the window where the munchies had been snacking.
Today's Reno tip- make sure you have an adequate support base to help with babysitting etc if you plan to renovate with kids. Also even the most inexperienced family members can help with things like washing walls etc if they are keen to help. Don't turn anybody down.
Today there were guided tours for the family. Safety gear a must! The kids searched the backyard for nuts while the adults got the low down on the plans.
That left little time for much else except repairing the window where the munchies had been snacking.
Today's Reno tip- make sure you have an adequate support base to help with babysitting etc if you plan to renovate with kids. Also even the most inexperienced family members can help with things like washing walls etc if they are keen to help. Don't turn anybody down.
Sunday, September 16, 2012
Day 12 - seals in the bathroom
Today the wet sealing is complete! A lovely blue coat of sticky paint stuff that seals the bathroom. Something to do with making sure the tiles don't fall off. That seems quite important to me. Don't want to tile falling off in the middle of the long relaxing bath I am invisaging myself taking. It might knock off my glass of wine! Sadly a few more weeks before that will even be possible.
Today's Reno tip- it seems obviously but went paint a floor start from the furthest corner from the door and work your way back to the door. Don't want to paint yourself into a corner! You laugh but we have seen this done in a building site in china. I will see if I can find the picture.
Today's Reno tip- it seems obviously but went paint a floor start from the furthest corner from the door and work your way back to the door. Don't want to paint yourself into a corner! You laugh but we have seen this done in a building site in china. I will see if I can find the picture.
Day 11 - putting up walls
Today was rebuilding day. The wall to the bathroom had to be repaired( read here rebuilt) after the munchy crunchies had their way with it. Thankfully it hadn't been a supporting wall or the roof could have been quite saggy. I know how it would have felt!
It has given the bathroom back it's shape and we can really see how it's going to look. It's amazing what a difference it made taking out the cupboard in the bathroom and replacing it with a shower. Next bug job is to wet seal the bathroom ready for tiling.
Today's Reno tip- if you ate putting in a wall or rebuilding one, think about whether you want to hang or build anything out from that wall. Put in extra noggins in the wall so you can put screws straight in where you want them. That is unless you prefer my method of ten holes for every screw! Noggins are those little bits of wood between the upright bits of wood. That is the technical definition in case you were wondering.
It has given the bathroom back it's shape and we can really see how it's going to look. It's amazing what a difference it made taking out the cupboard in the bathroom and replacing it with a shower. Next bug job is to wet seal the bathroom ready for tiling.
Today's Reno tip- if you ate putting in a wall or rebuilding one, think about whether you want to hang or build anything out from that wall. Put in extra noggins in the wall so you can put screws straight in where you want them. That is unless you prefer my method of ten holes for every screw! Noggins are those little bits of wood between the upright bits of wood. That is the technical definition in case you were wondering.
Thursday, September 13, 2012
Day 10 - one tenth of the way
This was a day of milestones. First day on site working for me. First day of daycare for the little one. One tenth of the way through our timeframe. Dont think I could say we were one tenth of the way through but we are getting there.
So far-
bathroom -gutted, sheeted and bath in. Plumbing adjusted.
Kitchen- wall taken out but waiting on support beam
Bed 1- walls washed, windows prepped
Bed 2- walls taken off and termite damaged rebuilt
Annex- walls, ceiling and floor stripped
Lounge- windows and doorways prepped
Reno tip for today- if you do nothing else to a house when you renovate, fill in all the holes- that includes the gaps around the outside of windows- before you paint. It will make the world of difference.
So far-
bathroom -gutted, sheeted and bath in. Plumbing adjusted.
Kitchen- wall taken out but waiting on support beam
Bed 1- walls washed, windows prepped
Bed 2- walls taken off and termite damaged rebuilt
Annex- walls, ceiling and floor stripped
Lounge- windows and doorways prepped
Reno tip for today- if you do nothing else to a house when you renovate, fill in all the holes- that includes the gaps around the outside of windows- before you paint. It will make the world of difference.
Day 9- rub a dub dub
The bath went in today. It really is starting to feel like a bathroom. It is amazing the amount of little things you have to decide. Are the tiles going to come up to the bath, over the end of the bath or form a ledge around the bath? How high are you going to put the shower? Which way will the door open? Where are you going to put the hooks for the towels etc etc etc? So much easier to sit back and go- I don't like that towel rail there rather than choose one from scratch!
Reno tip for today- if you are tiling the floor through to the shower remember that where you put the drain hole in the shower is going to have to be lower than the rest of your floor otherwise the water want drain down the hole.
Reno tip for today- if you are tiling the floor through to the shower remember that where you put the drain hole in the shower is going to have to be lower than the rest of your floor otherwise the water want drain down the hole.